Academic Titles
-
2004 - Continues Professor
Middle East Technical University, Faculty Of Engineering, Department Of Civil Engineering
-
1996 - 2004 Associate Professor
Middle East Technical University, Faculty Of Engineering, Department Of Civil Engineering
-
1990 - 1996 Assistant Professor
Middle East Technical University, Faculty Of Engineering, Department Of Civil Engineering
-
1993 - 1994 Visiting Lecturer
University of Reading, Department of Construction Management and Engineering
-
1985 - 1990 Instructor
Middle East Technical University, Faculty Of Engineering, Department Of Civil Engineering
-
1980 - 1985 Research Assistant
Middle East Technical University, Faculty Of Engineering, Department Of Civil Engineering
Advising Theses
-
INCORPORATING COMPLEXITY INTO RISK MANAGEMENT: AN INTEGRATED RISK ASSESSMENT PROCESS FOR MEGA CONSTRUCTION PROJECTS
Dikmen Toker İ. , Birgönül M. T. (Co-Consultant)
H.HÜSEYİN(Student), Doctorate, 2020 -
FMEA-based methodology for delay analysis of construction projects
-
DEVELOPMENT OF DISPUTE PREDICTION AND RESOLUTION METHOD SELECTION MODELS FOR CONSTRUCTION DISPUTES
-
A causal mapping approach for the analysis of construction disputes
-
Development of a risk assessment method for sustainable construction of megaprojects
-
Awareness of the turkish construction industry towards industry 4.0 technologies and concepts
-
Project-based innovation performance assessment in the housing sector: A case study using innovation radar
-
A bayesian belief network based delay risk assessment tool for tunnel projects – BBN tunnel
-
Risk identification and assessment for ppp integrated health campus projects in Turkey a case study: Kayseri integrated health campus
-
Institutionalization process in a family firm: A case study
-
An Investigation of material waste management in prefabricated construction industry and developing a tool for effective management of waste
-
EXPLORATION OF BLACK SWANS AND THEIR IMPACTS ON CONSTRUCTION COMPANIES: THE CASE OF ARAB SPRING
-
Similarity assessment of countries to facilitate learning from international construction projects
-
AN INVESTIGATION OF MATERIAL WASTE MANAGEMENT IN PREFABRICATED CONSTRUCTION INDUSTRY AND DEVELOPING AN INTEGRATED WASTE MANAGEMENT TOOL
BİRGÖNÜL M. T. (Co-Consultant) , DİKMEN TOKER İ. (Co-Consultant)
B.RAHMANI(Student), Doctorate, 2018 -
A study on the price escalation system in public construction contracts in Turkey
-
Development of a lessons learned management process model and a web-based tool for construction companies
-
Glocalization in international construction projects
-
The evaluation of construction projects realized with public private partnership model in Turkey
-
A Fuzzy structural equation model to analyze relationships between determinants of safety performance in construction sites: development of a safety performance index assessment tool
-
The future of green building contracts in Turkey
BİRGÖNÜL M. T. (Co-Consultant) , DİKMEN TOKER İ. (Co-Consultant)
S.MOHAMMADI(Student), Postgraduate, 2015 -
A fuzzy structural equation model to analyze relationships between determinants of safety performance in construction sites: Development of a safety performance index assessment tool.
M.ÖZDEMİR(Student), Doctorate, 2015 -
Future of green building contracts in Turkey
-
Turkish contractors in the project finance of power projects in Sub-Saharan Africa (SSA)
-
Using Monte Carlo simulation and multi-agent systems to estimate financial feasibility of hepp projects tendered on a bot basis: A case study from Turkey
-
Factors affecting the risk ratings assigned by decision-makers under uncertain situations: The case of international construction
-
Social network analysis of construction companies operating in international markets: The case of Turkish contractors
-
Identifying the effects of lean construction principles on variability of project duration /
-
Cost comparison of falling from fragile roof in terms of occupational health and safety
S.YALÇIN(Student), Postgraduate, 2014 -
IDENTIFYING THE EFFECTS OF LEAN CONSTRUCTION PRINCIPLES ON VARIABILITY OF PROJECT DURATION
BİRGÖNÜL M. T. (Co-Consultant) , DİKMEN TOKER İ. (Co-Consultant)
H.HÜSEYİN(Student), Postgraduate, 2014 -
Buffer sizing model with fuzzy assessment on concrete gravity dam and HEPP projects /
-
Cost comparison of falling from fragile roof type accidents in terms of occupational health and safety /
-
Development of a knowledge based risk mapping tool for international construction projects
Dikmen Toker I. , Birgönül M. T. (Co-Consultant)
A.Ecem(Student), Postgraduate, 2012 -
Developing a knowledge taxonomy for business development in construction companies: A case of Turkish construction industry
-
A taxonomy for causes of changes in construction
-
A fuzzy delay assessment tool for construction projects
-
Occupational health and safety, hazard identification, risk assessment, determining controls: Case study on cut and cover underground stations and tunnel construction
C.Ceyhan(Student), Postgraduate, 2012 -
Development of a knowledge-based risk mapping tool for International Construction Projects
-
Comparison of FIDIC conditions of contract (1999) and UNCITRAL Legal Guide from prospective disputes and claims perspective
BİRGÖNÜL M. T. (Co-Consultant) , DİKMEN TOKER İ. (Co-Consultant)
F.PELİN(Student), Postgraduate, 2012 -
A model-based guidance and vulnerability assessment approach for facilities under the threat of multi-hazard emergencies
M.AYHAN(Student), Postgraduate, 2012 -
Comparison of FIDIC conditions of contract (1999) and UNCITAL legal guide from prospective disputes and claims perspectives
-
Shortcomings of delay analysis practices: A case study using an integrated approach
Ş.BEKTAŞ(Student), Postgraduate, 2012 -
Occupational health and safety hazard identification, risk assessment, determining controls: case study on cut and cover underground stations and tunnel construction
-
An ontology-based approach for delay analysis
-
Critical success factors for build operate transfer (BOT) projects: Lessons learned from airport projects
-
The route map of turkish international contracting services – lessons learnt and recommendations for the
-
The route map of Turkish international contracting services-Lessons learnt and recommendations for the future
Birgönül M. T. , Dikmen Toker I. (Co-Consultant)
A.SAKIN(Student), Postgraduate, 2011 -
Analysis of organisational routines to understand change in construction: The case of turkish construction industry
-
Identification and representation of information items required for vulnerability assessment and multi-hazard emergency response operations
-
Identification of risk paths in international construction projects
-
Institutionalization of construction firms: Turkish contractors’ case
Birgönül M. T. , Dikmen Toker I. (Co-Consultant)
Ö.Yavuzyılmaz(Student), Postgraduate, 2010 -
Development of an expert system for the quantification of fault rates in traffic accidents
-
Development of a multi agent system for negotiation of cost overrun in international construction projects
-
Analogical reasoning for risk assessment and cost overrun estimation in construction projects
-
A conceptual performance measurement framework for construction industry
-
Contract management behavior of turkish construction companies in international contracts
-
Development of an activity based risk assessment tool using integrated duration – cost influence network
-
Developing a strategic information system for construction companies
-
A generic risk and vulnerability assessment framework for international construction projects
-
Strategic group analysis: Strategic perspective, differentiation and performance in construction
-
Risk assessment of international construction projects using the Analytic Network Process
Birgönül M. T. , Dikmen I. (Co-Consultant)
A.Suliman(Student), Postgraduate, 2007 -
Critical success factors for partnering in the Turkish construction industry
-
Modeling the performance of international construction joint ventures
-
Development of a risk assessment tool for post-project appraisal
-
Using cognitive maps for modeling project success
-
Organizational decline and bankruptcy prediction model for the Turkish construction companies
-
Country risk assessment in the construction industry
-
An expert system for the quantification of fault rates in construction fall accidents
-
Comparison of International Federation of Consulting Engineers and general specification for public works contracts from risk management perspective
-
Determination of contingency for international construction projects during bidding stage
A.ARİF(Student), Postgraduate, 2005 -
simplified approach
-
Case based decision support system for bid markup estimation of international construction projects at the tender stage
BİRGÖNÜL M. T. (Co-Consultant) , DİKMEN TOKER İ. (Co-Consultant)
A.KAMİL(Student), Postgraduate, 2005 -
Development of a risk management decision support system for international construction projects
BİRGÖNÜL M. T. (Co-Consultant) , DİKMEN TOKER İ. (Co-Consultant)
A.ERDEM(Student), Postgraduate, 2005 -
Quantification of acceleration claims: A simplified approach
BİRGÖNÜL M. T. (Co-Consultant) , DİKMEN TOKER İ. (Co-Consultant)
A.ÖZGE(Student), Postgraduate, 2005 -
Organizational memory in construction companies: A case-based reasoning model as an organizational learning tool
B.ÖZORHON(Student), Postgraduate, 2004 -
İhale yönetimi bilgi sistemleri: İnşaat projelerinde elektronik ihale teklif yönetim sistemi (EİTYS)
Tuncan M., Birgönül M. T. (Co-Consultant)
G.ARSLAN(Student), Doctorate, 2002 -
Marketing in the Turkish construction industry.
İ.ÖZCENK(Student), Postgraduate, 2002 -
Impact of construction management graduate education on professional life
E.ÇANGA(Student), Postgraduate, 2002 -
An Innovation management model for construction companies: Case-studies from the Turkish construction industry
S.UMUT(Student), Postgraduate, 2002 -
An Organizational learning framework as a driver of organizational performance of Turkish construction companies
T.ATAOĞLU(Student), Postgraduate, 2002 -
Organizational effectiveness in Turkish construction companies: An artificial neural network based prediction model
S.KIZILTAŞ(Student), Postgraduate, 2002 -
Strategic decision making in construction companies: An artificial neural network based decision support system for international market selection
İ.DİKMEN(Student), Doctorate, 2001 -
Dispute creation and resolution mechanisms of Turkish construction sector in public projects
G.GÜNAY(Student), Postgraduate, 2001 -
Value management approach for the selection of construction materials for the buildings owned by Air Force Command
S.DEREN(Student), Postgraduate, 2001 -
Refinement of Benefit Cost analysis results for highway projects
N.Özkan(Student), Postgraduate, 2000 -
Effects of economic recession periods on Turkish construction companies
L.ÇAĞRI(Student), Postgraduate, 2000 -
Critical revievo of construction machinery costs within the context of general price analysis
S.ÖZTABAK(Student), Postgraduate, 2000 -
A Genetic algorithm for multi-mode resource constrained project scheduling
B.GÜVENÇ(Student), Postgraduate, 2000 -
Problems faced by foreign contractors working in Turkey
S.ÖNEN(Student), Postgraduate, 2000 -
A Comparative study on the reliability-based risk assessment in project management of coastal structures
G.PİŞKİN(Student), Postgraduate, 2000 -
ISO 9000 standarts in the Turkish construction industry
D.TÜRK(Student), Postgraduate, 1999 -
Development of a quality assurance system for highways in Turkey.
Inal A., Birgönül M. T. (Co-Consultant)
D.Özmen(Student), Postgraduate, 1998 -
Subcontracting relationship between subcontractors and contractors in Turkish construction sector
Arikan M. S. , Birgönül M. T. (Co-Consultant)
A.Çevik(Student), Postgraduate, 1998 -
Evaluation of the subcontracting system in Turkey
Birgönül M. T. (Co-Consultant) , Arikan M. S.
E.Gökçek(Student), Postgraduate, 1998 -
CPM (Critical Path Method) applications and problems faced in Turkish construction sector
Keyder E., Birgönül M. T. (Co-Consultant)
A.Yurdakul(Student), Postgraduate, 1998 -
A reliability-based risk assessment model for coastal projects
Ergin A. , Birgönül M. T. (Co-Consultant)
C.Elmar(Student), Doctorate, 1998 -
Performance of Turkish Contractors working abroad
M.METİN(Student), Postgraduate, 1998 -
Risk perception and trends of Turkish construction compaies
A.PETEK(Student), Postgraduate, 1998 -
Risk analysis and cost simulation of coastal projects
Ergin A. , Birgönül M. T. (Co-Consultant)
M.Ali(Student), Postgraduate, 1998 -
Investigation of state procurement law and amendments necessary to make it consistent with the World Bank proctices
Ç.SÜRÜCÜ(Student), Postgraduate, 1998 -
Quality management in construction
Arikan M. S. , Birgönül M. T. (Co-Consultant)
E.Kökçüoğlu(Student), Postgraduate, 1997 -
Toplu konut inşaatlarında düşük kaliteden kaynaklanan maliyetler
Birgönül M. T. , Yeğinobalı A.(Co-Consultant)
A.Kazaz(Student), Doctorate, 1997 -
Time, cost and quality management of mass housing projects
M.CAN(Student), Postgraduate, 1996 -
Economic analysis multi-stage housing production model
M.KAAN(Student), Postgraduate, 1996 -
Management of political risk in public non-building construction projects
M.ŞEFİK(Student), Postgraduate, 1996 -
Current quality control systems used in Turkey and suggestions for further improvements
İ.ÇETİN(Student), Postgraduate, 1996 -
Risk analysis of construction projects based on unit prices under inflationary conditions
D.ELMAS(Student), Postgraduate, 1996 -
Risk management of build-operate-transfer (BOT) project in developing countries
İ.ÖZDOĞAN(Student), Postgraduate, 1996 -
An Evoluation of value management practice in Türkish Construction Sectör
A.ASLAN(Student), Postgraduate, 1995 -
French model of water distribution and sewage collection and treatment service administration under private company management
M.TUNÇ(Student), Postgraduate, 1995 -
Turkish contracting sector: An organisational survey of Turkish contracting companies
I.RENDA(Student), Postgraduate, 1995 -
An Expert system approach based on Şanlıurfa tunnel construction experiences
B.AKPINAR(Student), Postgraduate, 1995 -
A Case study on interaction between time and cost constituents of a mass-housing construction project
A.BARÇIN(Student), Postgraduate, 1993 -
Critical review of quality and time control aspects in some major Libyan construction projects
A.OMER(Student), Postgraduate, 1993 -
An Elastic timing method proposed for construction schedules
A.SİBEL(Student), Postgraduate, 1992 -
Measures for improving quality and maintaining economy in low-cost housing projects
C.ERDOĞAN(Student), Postgraduate, 1992 -
An Expert system approach to concrete supervising and precast connections
Ş.TOPKAYA(Student), Postgraduate, 1992 -
Effect of inflation and payment delay on profit margin under unit price contract and the compensation methods
A.NURHUSSEİN(Student), Postgraduate, 1992 -
Thermal insulation and energy conservation measures for low-cost housing
Yeğinobalı A., Birgönül M. T. (Co-Consultant)
T.Şahin(Student), Postgraduate, 1991 -
A Methodology for the evaluation of proposals tendered on the basis of build-operate-transfer model
A.KORKMAZ(Student), Postgraduate, 1991 -
The Integration of CPM and materials management in project management
M.TAŞKINSOY(Student), Postgraduate, 1991 -
Probabilistic quantity estimation of basic construction items by linear regression method
V.ÖZKARAMETE(Student), Postgraduate, 1989 -
A Computer program related to some standard earthwork equipments
B.JARKAS(Student), Postgraduate, 1989 -
Linear construction planning technique
H.ÇAKA(Student), Postgraduate, 1989 -
A Survey on the construction equipment supply and importation of the Turkish overseas contractors upon completion of their contract
R.ÇUHADAR(Student), Postgraduate, 1989 -
Concrete construction under different climatic conditions and factors affecting the cost estimate
J.LABABİDİ(Student), Postgraduate, 1988