Publications & Works

Articles Published in Journals That Entered SCI, SSCI and AHCI Indexes

A SUPPORT VECTOR MACHINE METHOD FOR BID/NO BID DECISION MAKING

JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, vol.23, no.5, pp.641-649, 2017 (Journal Indexed in SCI) identifier identifier

Pareto Front Particle Swarm Optimizer for Discrete Time-Cost Trade-Off Problem

JOURNAL OF COMPUTING IN CIVIL ENGINEERING, vol.31, no.1, 2017 (Journal Indexed in SCI) identifier identifier

Hybrid Optimization Method for Large-Scale Multimode Resource-Constrained Project Scheduling Problem

JOURNAL OF MANAGEMENT IN ENGINEERING, vol.32, no.6, 2016 (Journal Indexed in SCI) identifier identifier

Critical Sequence Crashing Heuristic for Resource-Constrained Discrete Time-Cost Trade-Off Problem

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, vol.142, no.3, 2016 (Journal Indexed in SCI) identifier identifier

Backward-Forward Hybrid Genetic Algorithm for Resource-Constrained Multiproject Scheduling Problem

JOURNAL OF COMPUTING IN CIVIL ENGINEERING, vol.29, no.5, 2015 (Journal Indexed in SCI) identifier identifier

A hybrid genetic algorithm for the discrete time-cost trade-off problem

EXPERT SYSTEMS WITH APPLICATIONS, vol.39, no.13, pp.11428-11434, 2012 (Journal Indexed in SCI) Creative Commons License Sustainable Development identifier identifier

Range estimation of construction costs using neural networks with bootstrap prediction intervals

EXPERT SYSTEMS WITH APPLICATIONS, vol.38, no.8, pp.9913-9917, 2011 (Journal Indexed in SCI) identifier identifier

PREDESIGN COST ESTIMATION OF URBAN RAILWAY PROJECTS WITH PARAMETRIC MODELING

JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, vol.15, no.4, pp.405-409, 2009 (Journal Indexed in SCI) identifier identifier

Parametric Range Estimating of Building Costs Using Regression Models and Bootstrap

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, vol.134, no.12, pp.1011-1016, 2008 (Journal Indexed in SCI) identifier identifier

Geographic information system-based visualization system for planning and monitoring of repetitive construction projects

CANADIAN JOURNAL OF CIVIL ENGINEERING, vol.35, no.11, pp.1342-1346, 2008 (Journal Indexed in SCI) identifier identifier

Construction labor productivity modeling with neural networks

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, vol.124, no.6, pp.498-504, 1998 (Journal Indexed in SCI) Sustainable Development identifier identifier

Articles Published in Other Journals

A mixed integer programming method for multi-project resource leveling

Journal of Construction Engineering, Management Innovation, vol.3, no.2, pp.131-140, 2020 (Refereed Journals of Other Institutions)

Refereed Congress / Symposium Publications in Proceedings

4D BIM Integrated Productivity Revision of ConstructionProjects

6th International Project and Construction Management Conference (e-IPCMC2020), İstanbul, Turkey, 12 - 14 November 2020, pp.572-580

A Heuristic for Resource-Constrained Multi-ProjectDiscrete Time-Cost Trade-Off Problem

International Project and Construction Management Conference, IPCMC 2018, Cyprus (Kktc), 16 - 18 November 2018

Smart Contracts in Construction Industry

IPCMC 2018, 16 - 18 November 2018, pp.767-774

Integrating a Meta-Heuristic Method into Microsoft Project for Time-Cost Trade-off Analyses

International Project and Construction Management Conference, IPCMC 2018, Cyprus (Kktc), 16 - 18 November 2018

An Efficient Heuristic Method for Pareto Oriented Optimization of Time-Cost Trade-Off Problem for Construction Projects

Procs IO2017 The XVIII Congress of the Portuguese Association of Operational Research, Valencia, Spain, 28 - 30 June 2017

Project Portfolio Management Software Use in Construction Industry

Creative Construction Conference 2016, Budapest, Hungary, 25 - 28 June 2016, vol.1, pp.420-425

A Mixed Integer Model for Optimization of Discrete Time Cost Tradeoff Problem

Creative Construction Conference 2016, Budapest, Hungary, 25 - 28 June 2016, vol.1, pp.478-485

Pareto oriented optimization of discrete time cost trade off problem using particle swarm optimization

31st Annual ARCOM Conference, Lincoln, United Kingdom, 7 - 09 September 2015, pp.33-40 identifier

A genetic algorithm for resource leveling of construction projects

28th Annual Conference of the Association of Researchers in Construction Management, ARCOM 2012, Edinburgh, United Kingdom, 3 - 05 September 2012, vol.2, pp.1047-1054 identifier

Review of conceptual cost modeling techniques

2005 AACE International 49th Annual Meeting, New Orleans, LA, United States Of America, 26 - 29 June 2005, pp.1-4 identifier

Labor productivity modeling with neural networks

Proceedings of the 1996 40th Annual Meeting of AACE International, Vancouver, Canada, 23 - 26 June 1996 Sustainable Development identifier