Yayınlar & Eserler

Makaleler 31
Tümü (31)
SCI-E, SSCI, AHCI (29)
SCI-E, SSCI, AHCI, ESCI (30)
ESCI (1)
Scopus (30)
TRDizin (1)
Hakemli Bilimsel Toplantılarda Yayımlanmış Bildiriler 17

1. A DECENTRALIZED BLOCKCHAIN FRAMEWORK FOR TRACING GREEN/SUSTAINABLE MATERIALS DURING BUILDING LIFE CYCLE

European Conference on Computing in Construction, EC3 2025 and 42nd International CIB W78 Conference on IT in Construction, 2025, Porto, Portekiz, 14 - 17 Temmuz 2025, (Tam Metin Bildiri)

2. A BLOCKCHAIN AND DECENTRALIZED CLOUD FRAMEWORK FOR TRUST-FREE AUTOMATED PROGRESS PAYMENT OF CONSTRUCTION PROJECTS

European Conference on Computing in Construction, EC3 2025 and 42nd International CIB W78 Conference on IT in Construction, 2025, Porto, Portekiz, 14 - 17 Temmuz 2025, (Tam Metin Bildiri)

3. 4D BIM Integrated Productivity Revision of ConstructionProjects

6th International Project and Construction Management Conference (e-IPCMC2020), İstanbul, Türkiye, 12 - 14 Kasım 2020, ss.572-580, (Tam Metin Bildiri)

5. A Heuristic for Resource-Constrained Multi-ProjectDiscrete Time-Cost Trade-Off Problem

International Project and Construction Management Conference, IPCMC 2018, Kıbrıs (Kktc), 16 - 18 Kasım 2018, (Tam Metin Bildiri)

7. Smart Contracts in Construction Industry

IPCMC 2018, 16 - 18 Kasım 2018, ss.767-774, (Tam Metin Bildiri)

8. Integrating a Meta-Heuristic Method into Microsoft Project for Time-Cost Trade-off Analyses

International Project and Construction Management Conference, IPCMC 2018, Kıbrıs (Kktc), 16 - 18 Kasım 2018, (Tam Metin Bildiri)

9. An Efficient Heuristic Method for Pareto Oriented Optimization of Time-Cost Trade-Off Problem for Construction Projects

Procs IO2017 The XVIII Congress of the Portuguese Association of Operational Research, Valencia, İspanya, 28 - 30 Haziran 2017, (Özet Bildiri)

10. Kaynak Dengeleme Problemine Öncelikli Diferansiyel Evrim Algoritmasıyla Bir Yaklaşım

4. Proje ve Yapım Yönetimi Kongresi, Eskişehir, Türkiye, 3 - 05 Kasım 2016, (Tam Metin Bildiri)

11. Project Portfolio Management Software Use in Construction Industry

Creative Construction Conference 2016, Budapest, Macaristan, 25 - 28 Haziran 2016, cilt.1, ss.420-425, (Tam Metin Bildiri)

12. A Mixed Integer Model for Optimization of Discrete Time Cost Tradeoff Problem

Creative Construction Conference 2016, Budapest, Macaristan, 25 - 28 Haziran 2016, cilt.1, ss.478-485, (Tam Metin Bildiri)

13. Pareto oriented optimization of discrete time cost trade off problem using particle swarm optimization

31st Annual ARCOM Conference, Lincoln, Birleşik Krallık, 7 - 09 Eylül 2015, ss.33-40, (Tam Metin Bildiri)

14. A genetic algorithm for resource leveling of construction projects

28th Annual Conference of the Association of Researchers in Construction Management, ARCOM 2012, Edinburgh, Birleşik Krallık, 3 - 05 Eylül 2012, cilt.2, ss.1047-1054, (Tam Metin Bildiri)

15. Review of conceptual cost modeling techniques

2005 AACE International 49th Annual Meeting, New Orleans, LA, Amerika Birleşik Devletleri, 26 - 29 Haziran 2005, ss.1-4, (Tam Metin Bildiri)

16. Uluslararası Projelerde Risk Primini Etkileyen Faktörlerin Belirlenmesi

3.Yapı İşletmesi Kongresi, Türkiye, 29 - 30 Eylül 2005, (Tam Metin Bildiri)

17. Labor productivity modeling with neural networks

Proceedings of the 1996 40th Annual Meeting of AACE International, Vancouver, Kanada, 23 - 26 Haziran 1996, (Tam Metin Bildiri) Sürdürülebilir Kalkınma
Metrikler

Yayın

48

Yayın (WoS)

30

Yayın (Scopus)

36

Atıf (WoS)

1516

H-İndeks (WoS)

20

Atıf (Scopus)

1900

H-İndeks (Scopus)

20

Atıf (Scholar)

1780

H-İndeks (Scholar)

18

Atıf (TrDizin)

6

H-İndeks (TrDizin)

1

Atıf (Diğer Toplam)

6

Proje

4

Tez Danışmanlığı

50

Açık Erişim

48
BM Sürdürülebilir Kalkınma Amaçları