Integrating a Meta-Heuristic Method into Microsoft Project for Time-Cost Trade-off Analyses


AMINBAKHSH S., SÖNMEZ R. , Aminbakhsh S., Atan T.

International Project and Construction Management Conference, IPCMC 2018, Kıbrıs (Kktc), 16 - 18 Kasım 2018

  • Basıldığı Ülke: Kıbrıs (Kktc)