Makaleler
78
Tümü (78)
SCI-E, SSCI, AHCI (64)
SCI-E, SSCI, AHCI, ESCI (67)
ESCI (3)
Scopus (72)
TRDizin (4)
Diğer Yayınlar (2)
4. TWO DIMENSIONAL CUTTING STOCK PROBLEM WITH MULTIPLE STOCK SIZES
INTERNATIONAL JOURNAL OF MANUFACTURING TECHNOLOGY AND MANAGEMENT
, cilt.38, sa.2, ss.95-125, 2024 (Scopus)
8. An Exact Solution Approach to the Type-II Transfer Line Balancing Problem
IFAC PapersOnLine
, cilt.55, sa.10, ss.442-447, 2022 (Scopus)
9. A Disassembly Line Balancing Problem with Hazardous Task Failures
IFAC PapersOnLine
, cilt.55, sa.10, ss.458-465, 2022 (Scopus)
10. A stochastic programming approach for the disassembly line balancing with hazardous task failures
International Journal of Production Research
, cilt.60, sa.10, ss.3237-3262, 2022 (SCI-Expanded, Scopus)
11. Rebalancing the assembly lines with total squared workload and total replacement distance objectives
International Journal of Production Research
, cilt.59, sa.22, ss.6702-6720, 2021 (SCI-Expanded, Scopus)
14. A Resource Constrained Project Scheduling Problem With Multi-Modes
INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT
, cilt.11, sa.1, ss.55-70, 2020 (ESCI, Scopus)
21. Rebalancing the assembly lines: exact solution approaches
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.55, sa.20, ss.5991-6010, 2017 (SCI-Expanded, Scopus)
22. PARALLEL PRODUCTİON LİNES WİTH SEQUENCE-DEPENDENT SETUP TİMES AND SİDE CONSTRAİNTS
Endüstri Mühendisliği
, cilt.28, sa.4, ss.7-22, 2017 (TRDizin)
23. A branch and bound algorithm for project scheduling problem with discounted cash flows
International Journal of Planning and Scheduling
, cilt.2, sa.3, ss.233-251, 2016 (Hakemli Dergi)
28. A resource investment problem with time/resource trade-offs
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
, cilt.65, sa.5, ss.777-790, 2014 (SCI-Expanded, SSCI, Scopus)
29. Branch and bound based solution algorithms for the budget constrained discrete time/cost trade-off problem
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
, cilt.64, sa.10, ss.1474-1484, 2013 (SCI-Expanded, SSCI, Scopus)
31. The multi-resource agent bottleneck generalised assignment problem
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.50, sa.2, ss.309-324, 2012 (SCI-Expanded, Scopus)
33. Heuristics for operational fixed job scheduling problems with working and spread time constraints
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
, cilt.132, sa.1, ss.107-121, 2011 (SCI-Expanded, Scopus)
34. Rescheduling unrelated parallel machines with total flow time and total disruption cost criteria
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
, cilt.62, sa.1, ss.152-164, 2011 (SCI-Expanded, SSCI, Scopus)
35. Flexible assembly line design problem with fixed number of workstations
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.49, sa.12, ss.3691-3714, 2011 (SCI-Expanded, Scopus)
36. A Lagrangean relaxation based approach for the capacity allocation problem in flexible manufacturing systems
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
, cilt.61, sa.5, ss.872-877, 2010 (SCI-Expanded, SSCI, Scopus)
37. Linear programming based approaches for the discrete time/cost trade-off problem in project networks
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
, cilt.61, sa.4, ss.676-685, 2010 (SCI-Expanded, SSCI, Scopus)
38. Working time constraints in operational fixed job scheduling
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.48, sa.21, ss.6211-6233, 2010 (SCI-Expanded, Scopus)
44. A fixed job scheduling problem with machine-dependent job weights
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.47, sa.9, ss.2231-2256, 2009 (SCI-Expanded, Scopus)
45. Capacity allocation problem in flexible manufacturing systems: branch and bound based approaches
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.47, sa.21, ss.5941-5958, 2009 (SCI-Expanded, Scopus)
46. Single machine scheduling with preventive maintenances
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.47, sa.7, ss.1753-1771, 2009 (SCI-Expanded, Scopus)
47. Generating all efficient solutions of a rescheduling problem on unrelated parallel machines
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.47, sa.19, ss.5245-5270, 2009 (SCI-Expanded, Scopus)
48. Minimizing the number of tool switching instants in Flexible Manufacturing Systems
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
, cilt.116, sa.2, ss.298-307, 2008 (SCI-Expanded, Scopus)
49. Operational fixed interval scheduling problem on uniform parallel machines
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
, cilt.112, sa.2, ss.756-768, 2008 (SCI-Expanded, Scopus)
50. The tool transporter movements problem in flexible manufacturing systems
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.46, sa.11, ss.3059-3084, 2008 (SCI-Expanded, Scopus)
51. Bi criteria flexible assembly line design problem with equipment decisions
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.46, sa.22, ss.6323-6343, 2008 (SCI-Expanded, Scopus)
52. Flow shop-sequencing problem with synchronous transfers and makespan minimization
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.45, sa.15, ss.3311-3331, 2007 (SCI-Expanded, Scopus)
53. Spread time considerations in operational fixed job scheduling
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.44, sa.20, ss.4343-4365, 2006 (SCI-Expanded, Scopus)
54. Capacity and tool allocation problem in flexible manufacturing systems
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
, cilt.57, sa.6, ss.670-681, 2006 (SCI-Expanded, SSCI, Scopus)
55. Minimizing total flow time on a single flexible machine
INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS
, cilt.18, sa.1, ss.55-73, 2006 (SCI-Expanded, Scopus)
61. Scheduling to minimize maximum earliness and number of tardy jobs where machine idle time is allowed
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
, cilt.54, sa.6, ss.661-664, 2003 (SCI-Expanded, SSCI, Scopus)
62. Scheduling parallel machines to minimize weighted flowtime with family set-up times
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.41, sa.6, ss.1199-1215, 2003 (SCI-Expanded, Scopus)
63. Parallel machine scheduling with family setup times to minimize total flowtime
International Journal of Operations and Quantitative Management
, cilt.8, sa.1, ss.47-56, 2002 (Scopus)
67. Scheduling a batch processing machine with non-identical job sizes
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.38, sa.10, ss.2173-2184, 2000 (SCI-Expanded, Scopus)
70. Tardiness minimization on parallel machines
International Journal of Production Economics
, cilt.55, sa.2, ss.163-168, 1998 (SCI-Expanded, Scopus)
73. Scheduling job families about an unrestricted common due date on a single machine
International Journal of Production Research
, cilt.35, sa.5, ss.1321-1330, 1997 (SCI-Expanded, Scopus)
75. AN EFFICIENT ALGORITHM FOR THE SINGLE-MACHINE TARDINESS PROBLEM
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
, cilt.36, sa.2, ss.213-219, 1994 (SCI-Expanded, Scopus)
76. Two Heuristic Approaches for the Total Tardiness Problem
Endüstri Mühendisliği
, cilt.1, ss.1-20, 1994 (TRDizin)
78. Minimizing Total Tardiness on a Single Machine
Endüstri Mühendisliği
, cilt.1, ss.1-20, 1990 (TRDizin)
Hakemli Bilimsel Toplantılarda Yayımlanmış Bildiriler
12
1. An Airport Gate Reassignment Model with Gate Disruptions
International Conference on Industrial Engineering and Operations Management , İstanbul, Türkiye, 7 - 10 Mart 2022, ss.88-89, (Özet Bildiri)
2. İki Amaçlı Sağlık Projelerinin Çizelgelenmesi İçin Yaklaşımlar
40. Yöneylem Araştırması ve Endüstri Mühendisliği Kongresi (YA/EM 2021), İstanbul, Türkiye, 5 - 07 Temmuz 2021, ss.31-32, (Özet Bildiri)
3. Stochastic Disassembly Line Balancing Problem with Hazardous Tasks
European Conference on Operational Research, Dublin, İrlanda, 23 - 26 Haziran 2019, ss.320, (Özet Bildiri)
5. Multiple stock size two dimensional cutting stock problem - an application to a marble company
EURO2018, 8 - 11 Temmuz 2018, (Özet Bildiri)
6. Solution Approaches for a Project Scheduling Problem with Multiple Modes and a Single Nonrenewable Resource
INFORMS 2017, 22 Ekim 2217 - 25 Ekim 2017, (Özet Bildiri)
7. Resource Constrained Project Scheduling Problem with Multiple Modes
16th Production Research Symposium, 6 - 09 Ekim 2016, (Tam Metin Bildiri)
8. A Blood Distribution System An Application to Turkish Red Crescent
INFORMS 2016, 3 - 06 Temmuz 2016, (Özet Bildiri)
9. A Project Scheduling Problem with Nonrenewable Resources
Informs 2016, 3 - 06 Temmuz 2016, (Özet Bildiri)