SCI, SSCI ve AHCI İndekslerine Giren Dergilerde Yayınlanan Makaleler
Disassembly line balancing with hazardous task failures – Model based solution approaches
Computers and Industrial Engineering
, cilt.190, 2024 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 2
- Captures
- Readers: 3
An airport gate reassignment problem with gate closures
Journal of Air Transport Management
, cilt.115, 2024 (SSCI)
PlumX Metrics
- Citations
- Citation Indexes: 2
- Captures
- Readers: 7
An integrated two dimensional cutting stock and lot sizing problem with two criteria
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING
, cilt.17, sa.5, ss.766-794, 2023 (SCI-Expanded)
PlumX Metrics
- Captures
- Readers: 3
A stochastic programming approach for the disassembly line balancing with hazardous task failures
International Journal of Production Research
, cilt.60, sa.10, ss.3237-3262, 2022 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 11
- Captures
- Readers: 14
Rebalancing the assembly lines with total squared workload and total replacement distance objectives
International Journal of Production Research
, cilt.59, sa.22, ss.6702-6720, 2021 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 11
- Captures
- Readers: 11
Exact and heuristic solution approaches for the airport gate assignment problem
Omega (United Kingdom)
, cilt.103, 2021 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 33
- Captures
- Readers: 30
An exact algorithm for the minimum squared load assignment problem
Computers and Operations Research
, cilt.106, ss.76-90, 2019 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 7
- Captures
- Readers: 11
A blood distribution problem with new transportation options - An application for the Turkish Red Crescent
European Journal of Industrial Engineering
, cilt.13, sa.3, ss.332-367, 2019 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 5
- Captures
- Readers: 6
- Mentions
- News Mentions: 1
Workload smoothing in simple assembly line balancing
COMPUTERS & OPERATIONS RESEARCH
, cilt.89, ss.51-57, 2018 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 54
- Captures
- Readers: 87
Solution approaches to the blood distribution problem of the Turkish Red Crescent
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING
, cilt.12, sa.3, ss.405-441, 2018 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 6
- Captures
- Readers: 11
Rebalancing the assembly lines: exact solution approaches
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.55, sa.20, ss.5991-6010, 2017 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 36
- Captures
- Readers: 24
A disassembly line balancing problem with fixed number of workstations
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
, cilt.249, sa.2, ss.592-604, 2016 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 59
- Captures
- Readers: 51
A branch and bound method for the line balancing problem in U-shaped assembly lines with equipment requirements
JOURNAL OF MANUFACTURING SYSTEMS
, cilt.36, ss.46-54, 2015 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 55
- Captures
- Readers: 58
LP relaxation-based solution algorithms for the multi-mode project scheduling with a non-renewable resource
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING
, cilt.9, sa.4, ss.450-469, 2015 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 7
- Captures
- Readers: 6
Bicriteria Multiresource Generalized Assignment Problem
NAVAL RESEARCH LOGISTICS
, cilt.61, sa.8, ss.621-636, 2014 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 8
- Captures
- Readers: 7
A resource investment problem with time/resource trade-offs
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
, cilt.65, sa.5, ss.777-790, 2014 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 6
- Usage
- Abstract Views: 161
- Downloads: 1
- Captures
- Readers: 28
Branch and bound based solution algorithms for the budget constrained discrete time/cost trade-off problem
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
, cilt.64, sa.10, ss.1474-1484, 2013 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 13
- Usage
- Abstract Views: 77
- Downloads: 1
- Captures
- Readers: 26
Optimising a nonlinear utility function in multi-objective integer programming
JOURNAL OF GLOBAL OPTIMIZATION
, cilt.56, sa.1, ss.93-102, 2013 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 7
- Captures
- Readers: 14
The multi-resource agent bottleneck generalised assignment problem
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.50, sa.2, ss.309-324, 2012 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 22
- Captures
- Readers: 23
Heuristics for operational fixed job scheduling problems with working and spread time constraints
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
, cilt.132, sa.1, ss.107-121, 2011 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 11
- Captures
- Readers: 22
Rescheduling unrelated parallel machines with total flow time and total disruption cost criteria
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
, cilt.62, sa.1, ss.152-164, 2011 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 24
- Captures
- Readers: 16
Flexible assembly line design problem with fixed number of workstations
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.49, sa.12, ss.3691-3714, 2011 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 24
- Captures
- Readers: 20
A Lagrangean relaxation based approach for the capacity allocation problem in flexible manufacturing systems
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
, cilt.61, sa.5, ss.872-877, 2010 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 3
- Captures
- Readers: 8
Linear programming based approaches for the discrete time/cost trade-off problem in project networks
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
, cilt.61, sa.4, ss.676-685, 2010 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 22
- Captures
- Readers: 30
Working time constraints in operational fixed job scheduling
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.48, sa.21, ss.6211-6233, 2010 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 6
- Captures
- Readers: 10
Multi-objective integer programming: A general approach for generating all non-dominated solutions
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
, cilt.199, sa.1, ss.25-35, 2009 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 105
- Captures
- Readers: 82
Assembly line balancing with station paralleling
COMPUTERS & INDUSTRIAL ENGINEERING
, cilt.57, sa.4, ss.1218-1225, 2009 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 51
- Captures
- Readers: 45
Bounding approaches for operation assignment and capacity allocation problem in flexible manufacturing systems
COMPUTERS & OPERATIONS RESEARCH
, cilt.36, sa.9, ss.2531-2540, 2009 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 10
- Captures
- Readers: 19
Beam search algorithm for capacity allocation problem in flexible manufacturing systems
COMPUTERS & INDUSTRIAL ENGINEERING
, cilt.56, sa.4, ss.1464-1473, 2009 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 4
- Captures
- Readers: 9
Operation assignment and capacity allocation problem in automated manufacturing systems
COMPUTERS & INDUSTRIAL ENGINEERING
, cilt.56, sa.2, ss.662-676, 2009 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 15
- Captures
- Readers: 6
Generating all efficient solutions of a rescheduling problem on unrelated parallel machines
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.47, sa.19, ss.5245-5270, 2009 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 21
- Captures
- Readers: 17
Capacity allocation problem in flexible manufacturing systems: branch and bound based approaches
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.47, sa.21, ss.5941-5958, 2009 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 5
- Captures
- Readers: 10
Single machine scheduling with preventive maintenances
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.47, sa.7, ss.1753-1771, 2009 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 49
- Captures
- Readers: 25
A fixed job scheduling problem with machine-dependent job weights
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.47, sa.9, ss.2231-2256, 2009 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 8
- Captures
- Readers: 8
Minimizing the number of tool switching instants in Flexible Manufacturing Systems
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
, cilt.116, sa.2, ss.298-307, 2008 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 25
- Captures
- Readers: 35
Operational fixed interval scheduling problem on uniform parallel machines
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
, cilt.112, sa.2, ss.756-768, 2008 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 11
- Captures
- Readers: 16
Bi criteria flexible assembly line design problem with equipment decisions
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.46, sa.22, ss.6323-6343, 2008 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 27
- Captures
- Readers: 18
The tool transporter movements problem in flexible manufacturing systems
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
, cilt.46, sa.11, ss.3059-3084, 2008 (SCI-Expanded)
PlumX Metrics
- Citations
- Citation Indexes: 16
- Captures
- Readers: 7
Minimizing total flow time on a single flexible machine
INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS
, cilt.18, sa.1, ss.55-73, 2006 (SCI-Expanded)
Diğer Dergilerde Yayınlanan Makaleler
TWO DIMENSIONAL CUTTING STOCK PROBLEM WITH MULTIPLE STOCK SIZES
INTERNATIONAL JOURNAL OF MANUFACTURING TECHNOLOGY AND MANAGEMENT
, cilt.38, sa.2, ss.95-125, 2024 (Scopus)
A Disassembly Line Balancing Problem with Hazardous Task Failures
IFAC PapersOnLine
, cilt.55, sa.10, ss.458-465, 2022 (Scopus)
An Exact Solution Approach to the Type-II Transfer Line Balancing Problem
IFAC PapersOnLine
, cilt.55, sa.10, ss.442-447, 2022 (Scopus)
A Resource Constrained Project Scheduling Problem With Multi-Modes
INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT
, cilt.11, sa.1, ss.55-70, 2020 (ESCI)
PARALLEL PRODUCTİON LİNES WİTH SEQUENCE-DEPENDENT SETUP TİMES AND SİDE CONSTRAİNTS
Endüstri Mühendisliği
, cilt.28, sa.4, ss.7-22, 2017 (Hakemli Dergi)
A branch and bound algorithm for project scheduling problem with discounted cash flows
International Journal of Planning and Scheduling
, cilt.2, sa.3, ss.233-251, 2016 (Hakemli Dergi)
Parallel machine scheduling with family setup times to minimize total flowtime
International Journal of Operations and Quantitative Management
, cilt.8, sa.1, ss.47-56, 2002 (Scopus)
Two Heuristic Approaches for the Total Tardiness Problem
Endüstri Mühendisliği
, cilt.1, ss.1-20, 1994 (Hakemli Dergi)
Minimizing Total Tardiness on a Single Machine
Endüstri Mühendisliği
, cilt.1, ss.1-20, 1990 (Hakemli Dergi)
Hakemli Kongre / Sempozyum Bildiri Kitaplarında Yer Alan Yayınlar
An Airport Gate Reassignment Model with Gate Disruptions
International Conference on Industrial Engineering and Operations Management , İstanbul, Türkiye, 7 - 10 Mart 2022, ss.88-89
İki Amaçlı Sağlık Projelerinin Çizelgelenmesi İçin Yaklaşımlar
40. Yöneylem Araştırması ve Endüstri Mühendisliği Kongresi (YA/EM 2021), İstanbul, Türkiye, 5 - 07 Temmuz 2021, ss.31-32
Stochastic Disassembly Line Balancing Problem with Hazardous Tasks
European Conference on Operational Research, Dublin, İrlanda, 23 - 26 Haziran 2019, ss.320
Multiple stock size two dimensional cutting stock problem - an application to a marble company
EURO2018, 8 - 11 Temmuz 2018
Solution Approaches for a Project Scheduling Problem with Multiple Modes and a Single Nonrenewable Resource
INFORMS 2017, 22 Ekim 2217 - 25 Ekim 2017
Resource Constrained Project Scheduling Problem with Multiple Modes
16th Production Research Symposium, 6 - 09 Ekim 2016
A Blood Distribution System An Application to Turkish Red Crescent
INFORMS 2016, 3 - 06 Temmuz 2016
A Project Scheduling Problem with Nonrenewable Resources
Informs 2016, 3 - 06 Temmuz 2016