-
1993 - Continues Professor
METU , Professor
-
1988 - 1993 Associate Professor (Promotion)
METU , Associate Professor (Promotion)
-
1984 - 1988 Assistant Professor
METU , Assistant Professor
-
1984 - 1984 Instructor/Reader
METU , Instructor/Reader
-
1976 - 1978 Assistant
METU , Assistant
-
MODEL AND PROCEDURES FOR THE JAMMER AND TARGET ALLOCATION PROBLEM
KIRCA Ö. (Advisor)
-
A two stage approach for hybrid-assembly line design
KIRCA Ö. (Advisor)
-
Multi-layer network design problems in telecommunication
-
Ammunition transfer system optimization problem
KIRCA Ö. (Advisor)
-
A heuristic approach for the single machine scheduling tardiness problems
KIRCA Ö. (Advisor)
-
Mixed-model two-sided assembly line balancing
KIRCA Ö. (Advisor)
-
Two-sided assembly line balancing models and heuristics
KIRCA Ö. (Advisor)
-
Assembly line balancing with multi-manned tasks
KIRCA Ö. (Advisor)
-
Multi-item inventory-routing problem for an FMCG company
KIRCA Ö. (Advisor)
-
A new approach to generating non-permutation schedules for flowshops with missing operations
KIRCA Ö. (Advisor)
-
Chocolate production line scheduling: A case study
KIRCA Ö. (Advisor)
-
Batch scheduling of incompatible jobs on a single reactor with dynamic arrivals
KIRCA Ö. (Advisor)
G.KORKMAZ(Student), Postgraduate, 2004 -
A general production and financial planning model for integrated poultry organizations
KIRCA Ö. (Advisor)
-
A Mixed model line sequencing problem with makespan minimization.
AZİZOĞLU M. (Co-Advisor), KIRCA Ö. (Co-Advisor)
B.SOYLU(Student), Postgraduate, 2002 -
A Branch and bound algorithm to minimize total weighted flowtime for the two-stage assembly scheduling problem
KIRCA Ö. (Advisor)
-
A Brench and bound algorithm to minimize total weighted flowtime for the two-stage assembly scheduling
KIRCA Ö. (Advisor)
A.TOZKAPAN(Student), Postgraduate, 1999 -
An Object-oriented graphical user interface for a production scheduling problem in air supply and maintenance centers
KIRCA Ö. (Advisor)
M.ERMİŞ(Student), Postgraduate, 1997 -
A Heuristic for flowskops with totalflow time minimization
KIRCA Ö. (Advisor)
A.GÜLÇİN(Student), Postgraduate, 1996 -
Multi-item lot sizing problem with setup times
KIRCA Ö. (Advisor)
H.SÜRAL(Student), Doctorate, 1996 -
Parallel machine scheduling to minimize total cost functions
KIRCA Ö. (Advisor)
M.AZİZOĞLU(Student), Doctorate, 1994 -
Heuristic procedures for multi-item dicrete lot sizing
KIRCA Ö. (Advisor)
A.KAYNARCA(Student), Postgraduate, 1991 -
Heuristic procedures for mulyi-item dicrete lot sizing
KIRCA Ö. (Advisor)
-
Aggregate production planning and material requirements planning systems design for an electronics company
KIRCA Ö. (Advisor)
A.TÜREÇ(Student), Postgraduate, 1991 -
Efficient procedures for multi-item lot sizing problems based on tight formulations
KIRCA Ö. (Advisor)
M.KÖKTEN(Student), Postgraduate, 1990 -
Heuristic procedures for the lot sizing problem with assembly structures
KIRCA Ö. (Advisor)
O.İRFANOĞLU(Student), Postgraduate, 1990 -
Algorithms for multi-level capacitated lot-sizing problem with set-up times
KIRCA Ö. (Advisor)
E.ŞAHİN(Student), Postgraduate, 1989 -
Simulated annealing: An implementation with large scale traveling salesman problems
KIRCA Ö. (Advisor)
M.KILIÇ(Student), Postgraduate, 1989 -
Formulations and heuristic procedures for location-allocation-routing problems (Larp's)
KIRCA Ö. (Advisor)
T.YURTSEVER(Student), Postgraduate, 1988 -
Heuristic procedures for multi-item dynamic lot sizing problem with set-up times
KIRCA Ö. (Advisor)
-
Heuristic procedures for multi-item dynamic lot sizing problems with set-up times
KIRCA Ö. (Advisor)
B.ULUÖZ(Student), Postgraduate, 1988 -
Formulation and heuristic procedures for location-allocation-routing problem (Larp's)
KIRCA Ö. (Advisor)