Chocolate production line scheduling: A case study


Tezin Türü: Yüksek Lisans

Tezin Yürütüldüğü Kurum: Orta Doğu Teknik Üniversitesi, Mühendislik Fakültesi, Endüstri Mühendisliği Bölümü, Türkiye

Tezin Onay Tarihi: 2006

Öğrenci: ENGİN ÇÖLOVA

Danışman: ÖMER KIRCA

Özet:

This study deals with chocolate production line scheduling. The particular production line allows producing multiple items at the same time. Another distinguishing property affecting the planning methodology is that an item can have different production capacities when produced in different product combinations which are called production patterns in this study. Planning is done on a 12 weeks rolling horizon. There are 21 products and 103 production patterns covering all the production possibilities. The subject of the study is to construct an algorithm that gives 12 weeks’ production values of each product and to construct the shift based scheduling of the first week of the planning horizon. The first part is Master Production Scheduling (MPS) and the objective is minimizing the shortage and overage costs. A mathematical modeling approach is used to solve the MPS problem. The second part is the scheduling part which aims to arrange the production patterns obtained from the MPS module within the shifts for the first week of the planning horizon considering the setup times. The MPS module is a large integer programming model. The challenge is finding a reasonable lower bound whenever possible. If it is not possible, finding a reasonable upper bound and seeking solutions better than that is the main approach. The scheduling part, after solving MPS, becomes a TSP and the setup times are sequence independent. In this part, the challenge is solving TSP with an appropriate objective function.