Yumuşak zeminde tünel açılmasının 2-boyutlu ve 3-boyutlu sonlu elemanlar modelleriyle karşılaştırılması.


Tezin Türü: Yüksek Lisans

Tezin Yürütüldüğü Kurum: Orta Doğu Teknik Üniversitesi, Mühendislik Fakültesi, İnşaat Mühendisliği Bölümü, Türkiye

Tezin Onay Tarihi: 2006

Tezin Dili: İngilizce

Öğrenci: Serkan Üçer

Danışman: BAHADIR SADIK BAKIR

Özet:

The Bolu Tunnels lie along Trans European Motorway (TEM) which is connecting Eastern Europe with the Middle East. The tunnels are approximately 3.0 km long, 40 m apart and have excavated cross sections more than 200 m2. In construction, New Austrian Tunneling Method (NATM) was used in soft ground. Due to the challenging ground conditions, many problems have been encountered during tunnelling. To solve these problems special construction techniques were adapted. To simulate and demonstrate the effectiveness of these construction techniques, 2D and 3D Finite Element Methods are utilized in this study. Through comparison between 2D and 3D modelling of advance of Bolu Tunnels, respective merits of these two approaches are investigated and the conditions under which shortcomings of the 2D approach become serious are identified.