Alternative feasibility studies for altiparmak dam and HEPP


Tezin Türü: Yüksek Lisans

Tezin Yürütüldüğü Kurum: Orta Doğu Teknik Üniversitesi, Mühendislik Fakültesi, İnşaat Mühendisliği Bölümü, Türkiye

Tezin Onay Tarihi: 2011

Öğrenci: MÜMTAZ AK

Eş Danışman: ALİ MELİH YANMAZ

Danışman: ELÇİN KENTEL ERDOĞAN

Özet:

Hydropower is the most important domestic energy source of Turkey. Thus, wise planning and development of the unused hydropower potential of the country is vital. There are many hydroelectric power plants under planning stage in our country. Altıparmak HEPP is one of them. General Directorate of Electrical Power Resources Survey and Development Administration (EİE) and ANC Enerji conducted two separate feasibility studies for Altıparmak HEPP in 2001 and 2009, respectively. Traditionally, the energy income calculations for HEPPs are based on DSİ or EİE Methods in Turkey. Both of these methods evaluate the firm and the secondary energy generations separately. Besides they use fixed prices for these two types of energies. However, hourly electricity prices are used for electricity trading in Turkey. A detailed economic analysis of Altıparmak HEPP is conducted in this study. The economic analysis included various factors, such as tailwater level change, varying operating levels for different seasons and precipitation and evaporation amounts which are not conventionally included in feasibility studies. Moreover, the energy income calculations are conducted with four different methods, the DSİ Method, the EİE Method, the ANC Method and the Variable Price Method (VPM). The VPM is developed in this study and it allows utilization of hourly electricity prices in calculating energy income of the HEPP. To shed some light on how hourly electricity prices develop, this thesis includes a chapter on the electricity market which explains the details of electricity trading in our country after the Electricity Market Balancing and Settlement Regulation became active in 2009.