Tezin Türü: Yüksek Lisans
Tezin Yürütüldüğü Kurum: Orta Doğu Teknik Üniversitesi, Mühendislik Fakültesi, İnşaat Mühendisliği Bölümü, Türkiye
Tezin Onay Tarihi: 2008
Tezin Dili: İngilizce
Öğrenci: Mehmet Küçükbeycan
Danışman: DOĞAN H. ALTINBİLEK
Özet:Renewable energy sources are getting much more important to reduce the increasing threat coming from greenhouse gases. Hydropower is the most important source of renewable energy. However, development of a hydropower project is a challenging engineering process. Several computer programs have been developed to make initial estimations on hydropower schemes. A computer program named RETScreen Small Hydro Project Model has been developed with the objective to make complete pre-feasibility studies including costing and financial analysis. Two case studies, which have been under construction in Turkey, will be used to check the accuracy of software in Turkish practice. Then in light of the results, RETScreen software will be used to make a pre-feasibility report on an existing multipurpose dam in Turkey. Electricity can be generated at existing dams which requires minor civil works. Porsuk Dam which is a 36 year old dam used for domestic, industrial and irrigation water supply will be evaluated for energy generation by constructing a penstock, powerhouse and installing electromechanical equipment.