A Study on Dam Instrumentation Retrofitting: Gökçekaya Dam


Tezin Türü: Yüksek Lisans

Tezin Yürütüldüğü Kurum: Orta Doğu Teknik Üniversitesi, Mühendislik Fakültesi, İnşaat Mühendisliği Bölümü, Türkiye

Tezin Onay Tarihi: 2008

Tezin Dili: İngilizce

Öğrenci: Onur Arı

Danışman: Ali Melih Yanmaz

Özet:

Multi-purpose project requirements lead to construction of large dams. In order to maintain the desired safety level of such dams, comprehensive inspections based on use of a number of precise instruments are needed. The ideal dam instrumentation system should provide time-dependent information about critical parameters so that possible future behavior of the structure can be predicted. New dams are normally equipped with adequate instrumentation systems. Most of the existing dams, however, do not have adequate instruments or current instrumentation systems may not be in good condition. By implementing the modern equipment to existing dams, the uncertainty associated with the impacts of aging or unexpected severe external events will be reduced and possible remedial measures can be taken accordingly. This study summarizes the major causes of dam failures and introduces the instruments to be used to monitor the key parameters of a dam. The concept of the instrument retrofitting to an unmonitored dam is highlighted through a case study. A sample system is proposed for Gökçekaya Dam, with reference to an investigation of the current condition of the structure. The deficiencies observed during a site visit are listed and the corresponding rehabilitative repair measures are suggested. Finally, different alternatives of a new instrumentation system are introduced and compared in terms of technical and economical aspects.