Delay Analysis for Wireless Communication Systems with Caching


Atak K., YÜKSEL TURGUT A. M.

27th Signal Processing and Communications Applications Conference (SIU), Sivas, Turkey, 24 - 26 April 2019, (Full Text)

  • Publication Type: Conference Paper / Full Text
  • Doi Number: 10.1109/siu.2019.8806376
  • City: Sivas
  • Country: Turkey
  • Keywords: Caching, heterogeneous wireless networks, optimization, mobility
  • Middle East Technical University Affiliated: No

Abstract

In this work, a two-tier heterogeneous network is studied. Both base stations and end-devices are capable of caching. A suboptimal cache placement algorithm is proposed for lower delays assuming a statistical mobility model. The results are compared with a lower bound, the effects of the number of base stations and cache capacities are investigated, and the tradeoff between network load ratio and delay is shown.