LOT STREAMING IN A 2-STAGE FLOW-SHOP WITH SET-UP, PROCESSING AND REMOVAL TIMES SEPARATED


CETINKAYA F.

JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, cilt.45, sa.12, ss.1445-1455, 1994 (SSCI, Scopus) identifier identifier

  • Yayın Türü: Makale / Tam Makale
  • Cilt numarası: 45 Sayı: 12
  • Basım Tarihi: 1994
  • Doi Numarası: 10.1057/jors.1994.221
  • Dergi Adı: JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
  • Derginin Tarandığı İndeksler: Social Sciences Citation Index (SSCI), Scopus
  • Sayfa Sayıları: ss.1445-1455
  • Anahtar Kelimeler: CHANGEOVER TIMES, FLOW SHOPS, LOT STREAMING, SCHEDULING, TRANSFER BATCHES
  • Orta Doğu Teknik Üniversitesi Adresli: Hayır

Özet

This paper considers the job (lot) scheduling problem for two-stage flow shops in which the movement of transfer batches (sublots) from the first stage to the next are allowed. Set-up, processing and removal times are considered as separable and independent of the order in which jobs are processed at any of two stages. An optimal transfer batch sizing and scheduling algorithm which has an objective of minimizing the maximum flow time (makespan) is developed and demonstrated by a numerical example.