A note on ''The general lot sizing and scheduling problem''


Koclar A., Sural H.

OR SPECTRUM, cilt.27, sa.1, ss.145-146, 2005 (SCI-Expanded) identifier identifier

  • Yayın Türü: Makale / Tam Makale
  • Cilt numarası: 27 Sayı: 1
  • Basım Tarihi: 2005
  • Doi Numarası: 10.1007/s00291-004-0181-7
  • Dergi Adı: OR SPECTRUM
  • Derginin Tarandığı İndeksler: Science Citation Index Expanded (SCI-EXPANDED), Scopus
  • Sayfa Sayıları: ss.145-146
  • Anahtar Kelimeler: lotsizing, scheduling, sequence dependent setup costs
  • Orta Doğu Teknik Üniversitesi Adresli: Evet

Özet

Fleischmann and Meyr (1997) develop a model for the lot sizing problem with sequence dependent setup costs. In this note we show that this model is limited to the case where production state between two consecutive periods is conserved only if the available capacity of the preceding period exceeds the minimum batch quantity. We generalize the model by modification.