Scheduling system for repetitive unit construction using line-of-balance technology


Creative Commons License

Arditi D., Tokdemir O. B., Suh K.

Engineering, Construction and Architectural Management, cilt.8, ss.90-103, 2001 (SCI-Expanded) identifier

  • Yayın Türü: Makale / Derleme
  • Cilt numarası: 8
  • Basım Tarihi: 2001
  • Doi Numarası: 10.1108/eb021173
  • Dergi Adı: Engineering, Construction and Architectural Management
  • Derginin Tarandığı İndeksler: Science Citation Index Expanded (SCI-EXPANDED), Social Sciences Citation Index (SSCI), Scopus, ABI/INFORM, Aerospace Database, Business Source Elite, Business Source Premier, Communication Abstracts, Compendex, ICONDA Bibliographic, Index Islamicus, INSPEC, Metadex, Civil Engineering Abstracts
  • Sayfa Sayıları: ss.90-103
  • Orta Doğu Teknik Üniversitesi Adresli: Hayır

Özet

Although line-of-balance (LOB) scheduling can be superior to bar charts and networks in repetitive-unit construction, there are indications that its use is not widespread. In this study, the major limitations of the existing LOB methodology are identified and then eliminated by developing a computer program called repetitive unit scheduling system (RUSS). An effective algorithm that facilitates the implementation of LOB scheduling is developed. A tool that handles logical and strategic limitations caused by the particular characteristics of repetitive activities is provided. A learning model is developed and incorporated into LOB calculations. The program is designed to optimize resource allocation by using multiples of the natural rhythm of activities. An optimum crew size that guarantees maximum productivity in an activity is used throughout the LOB calculations to achieve cost-optimized schedules. Non-linear and discrete activities are incorporated into the LOB calculations. RUSS displays the LOB diagram of every individual path in the unit network. It is believed that a system such as RUSS will make the LOB method more appealing to contractors of repetitive projects.