Profit-oriented disassembly-line balancing


Creative Commons License

ALTEKİN F. T., Kandiller L., ÖZDEMİREL N. E.

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, cilt.46, sa.10, ss.2675-2693, 2008 (SCI-Expanded) identifier identifier

  • Yayın Türü: Makale / Tam Makale
  • Cilt numarası: 46 Sayı: 10
  • Basım Tarihi: 2008
  • Doi Numarası: 10.1080/00207540601137207
  • Dergi Adı: INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
  • Derginin Tarandığı İndeksler: Science Citation Index Expanded (SCI-EXPANDED), Scopus
  • Sayfa Sayıları: ss.2675-2693
  • Anahtar Kelimeler: disassembly, line balancing, precedence relations, ASSEMBLY-LINE, DESIGN, REPRESENTATION, SEQUENCES
  • Orta Doğu Teknik Üniversitesi Adresli: Evet

Özet

As product and material recovery has gained importance, disassembly volumes have increased, justifying construction of disassembly lines similar to assembly lines. Recent research on disassembly lines has focused on complete disassembly. Unlike assembly, the current industry practice involves partial disassembly with profit-maximization or cost-minimization objectives. Another difference between assembly and disassembly is that disassembly involves additional precedence relations among tasks due to processing alternatives or physical restrictions. In this study, we define and solve the profit-oriented partial disassembly-line balancing problem. We first characterize different types of precedence relations in disassembly and propose a new representation scheme that encompasses all these types. We then develop the first mixed integer programming formulation for the partial disassembly-line balancing problem, which simultaneously determines (1) the parts whose demand is to be fulfilled to generate revenue, (2) the tasks that will release the selected parts under task and station costs, (3) the number of stations that will be opened, (4) the cycle time, and (5) the balance of the disassembly line, i.e. the feasible assignment of selected tasks to stations such that various types of precedence relations are satisfied. We propose a lower- and upper-bounding scheme based on linear programming relaxation of the formulation. Computational results show that our approach provides near optimal solutions for small problems and is capable of solving larger problems with up to 320 disassembly tasks in reasonable time.