Thesis Type: Postgraduate
Institution Of The Thesis: Middle East Technical University, Faculty of Engineering, Department of Civil Engineering, Turkey
Approval Date: 2007
Thesis Language: English
Student: Furkan Uysal
Supervisor: RİFAT SÖNMEZ
Abstract:In construction industry Gantt charts, network methods and Line of Balance (LOB) methods are generally used for planning and control of projects. Networking techniques such as Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) require technical knowledge and could be difficult to implement without proper scheduling background. Gantt charts and LOB techniques are usually easier to implement, however, similar to network techniques these techniques lack visualization. A graphical based scheduling and progress control method could improve existing techniques with visualization so that schedule information could be understood easily by the project participants. Geographic Information Systems (GIS) can be helpful for improving the traditional scheduling methods by utilizing spatial information. In this study, a prototype Global Positioning System (GPS) and GIS based LOB method is proposed. To illustrate the benefits, the proposed method will be applied to a pipeline project.