M. AZİZOĞLU Et Al. , "LP relaxation-based solution algorithms for the multi-mode project scheduling with a non-renewable resource," EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING , vol.9, no.4, pp.450-469, 2015
AZİZOĞLU, M. Et Al. 2015. LP relaxation-based solution algorithms for the multi-mode project scheduling with a non-renewable resource. EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING , vol.9, no.4 , 450-469.
AZİZOĞLU, M., ÇETİNKAYA, F. C., & Pamir, S. K., (2015). LP relaxation-based solution algorithms for the multi-mode project scheduling with a non-renewable resource. EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING , vol.9, no.4, 450-469.
AZİZOĞLU, MERAL, FERDA CAN ÇETİNKAYA, And Selin Kirbiyik Pamir. "LP relaxation-based solution algorithms for the multi-mode project scheduling with a non-renewable resource," EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING , vol.9, no.4, 450-469, 2015
AZİZOĞLU, MERAL Et Al. "LP relaxation-based solution algorithms for the multi-mode project scheduling with a non-renewable resource." EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING , vol.9, no.4, pp.450-469, 2015
AZİZOĞLU, M. ÇETİNKAYA, F. C. And Pamir, S. K. (2015) . "LP relaxation-based solution algorithms for the multi-mode project scheduling with a non-renewable resource." EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING , vol.9, no.4, pp.450-469.
@article{article, author={MERAL AZİZOĞLU Et Al. }, title={LP relaxation-based solution algorithms for the multi-mode project scheduling with a non-renewable resource}, journal={EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING}, year=2015, pages={450-469} }